SCHOOL: | Georgetown Day School |
LOCATION: | Washington, DC |
CONTRACTOR: | Whiting Turner Contracting |
ARCHITECT: | Bowie Gridley |
DATE OF INSTALLATION: | August, 2006 |
SUMMARY:
DES installed a total of (5) labs and (2) prep rooms: (1) chemical storage; and (1) greenhouse; consisting of wood laboratory casework. DES worked closely with Bowie Gridley and had the pleasure of assisting in the design of the laboratories. All casework was manufactured by Leonard Peterson & Company.